Primary sheave disassembly
Disassemble the parts in the order listed
below.
Primary sheave cap
1
Primary sheave spring
1
Collar
3
Roller
3
Washer
6
Collar
3
Weight
3
Washer
6
Fixed sheave
1
Stopper
1
Sliding sheave
1
Bushing
1
Spider
1
Left-handed thread.
Slider
6
Damper slider
3
For assembly, reverse the disassembly
procedure.
Clean the threads.
Apply LOCTITE648 AS illustrated in .
And then tighten the spider. (The spider must
be turned counterclockwise to be tightened.)
6 Nm (0.6 m•kg, 4.3 ft•lb)
14 Nm (1.4 m•kg, 10 ft•lb)
200 Nm (20.0 m•kg, 145 ft•lb)
16 mm (0.63 in)
30 mm (1.18 in)
PRIMARY SHEAVE AND DRIVE V-BELT
38
Summary of Contents for RX10RTL
Page 2: ......
Page 8: ......
Page 21: ......
Page 25: ......
Page 29: ......
Page 141: ......
Page 259: ......
Page 265: ...SPEC 113 ...
Page 289: ...SPEC 113 ...
Page 313: ...SPEC 113 ...
Page 334: ...SPEC CABLE ROUTING CHEMINEMENT DES CABLES KABELDRAGNINGSSCHEMA CABLE ROUTING 134 ...
Page 336: ...SPEC CABLE ROUTING 136 ...
Page 338: ...SPEC CABLE ROUTING 138 ...
Page 340: ...SPEC CABLE ROUTING 140 ...
Page 342: ...SPEC CABLE ROUTING 142 ...
Page 344: ...SPEC CABLE ROUTING 144 ...
Page 346: ...SPEC CABLE ROUTING 146 ...
Page 348: ...SPEC CABLE ROUTING 148 ...
Page 350: ......
Page 351: ......
Page 352: ...2005 07 E F Sw ITP ...