INSP
ADJ
POWER TRAIN
SHEAVE OFFSET ADJUSTMENT
1. Measure:
• Sheave offset
Use the sheave gauge.
Out of specification
→
Adjust.
NOTE:
NOTE:
Push the secondary sheave toward the inside
of vehicle frame first and measure the sheave
offset.
2. Adjust:
• Sheave offset
Adjustment steps:
• Apply the brake to lock the secondary
sheave.
• Remove the bolt (Secondary sheave)
,
washer
and secondary sheave
.
• Adjust the sheave offset by adding or remov-
ing shim(s)
.
Adding shim
→
Offset is increased.
Removing shim
→
Offset is decreased.
• Install the secondary sheave, bolt (secondary
sheave) and washer.
• Recheck the sheave offset. If out of specifica-
tion, repeat the above steps.
NOTE:
NOTE:
When adjusting the sheave offset, the second-
ary sheave free play (clearance) should be
adjusted.
Sheave offset:
13.5 ~ 16.5 mm (0.53 ~ 0.65 in)
Sheave gauge:
YS-42421-1
Shim size
Part Number
Thickness
90201-252F1
0.5 mm (0.02 in)
90201-25527
1.0 mm (0.04 in)
90201-25289
1.6 mm (0.06 in)
90201-25526
2.0 mm (0.08 in)
Bolt (secondary sheave):
64 Nm (6.4 m•kg, 46 ft•lb)
14
SHEAVE OFFSET ADJUSTMENT
Summary of Contents for RX10RTL
Page 2: ......
Page 8: ......
Page 21: ......
Page 25: ......
Page 29: ......
Page 141: ......
Page 259: ......
Page 265: ...SPEC 113 ...
Page 289: ...SPEC 113 ...
Page 313: ...SPEC 113 ...
Page 334: ...SPEC CABLE ROUTING CHEMINEMENT DES CABLES KABELDRAGNINGSSCHEMA CABLE ROUTING 134 ...
Page 336: ...SPEC CABLE ROUTING 136 ...
Page 338: ...SPEC CABLE ROUTING 138 ...
Page 340: ...SPEC CABLE ROUTING 140 ...
Page 342: ...SPEC CABLE ROUTING 142 ...
Page 344: ...SPEC CABLE ROUTING 144 ...
Page 346: ...SPEC CABLE ROUTING 146 ...
Page 348: ...SPEC CABLE ROUTING 148 ...
Page 350: ......
Page 351: ......
Page 352: ...2005 07 E F Sw ITP ...