CHAS
Order
Job/Part
Q’ty
Remarks
12
Master cylinder assembly
1
NOTE:
NOTE:
After installing all parts, refer to “CABLE
ROUTING” to check the cable, lead and
hose routings.
13
Handlebar holder (upper)
2
14
Cable holder
1
15
Handlebar
1
16
Handlebar joint
1
17
Cable guide (rear)
1
For installation, reverse the removal
procedure.
10 Nm (1.0 m•kg, 7.2 ft•lb)
15 Nm (1.5 m•kg, 11 ft•lb)
STEERING
34
Summary of Contents for RX10RTL
Page 2: ......
Page 8: ......
Page 21: ......
Page 25: ......
Page 29: ......
Page 141: ......
Page 259: ......
Page 265: ...SPEC 113 ...
Page 289: ...SPEC 113 ...
Page 313: ...SPEC 113 ...
Page 334: ...SPEC CABLE ROUTING CHEMINEMENT DES CABLES KABELDRAGNINGSSCHEMA CABLE ROUTING 134 ...
Page 336: ...SPEC CABLE ROUTING 136 ...
Page 338: ...SPEC CABLE ROUTING 138 ...
Page 340: ...SPEC CABLE ROUTING 140 ...
Page 342: ...SPEC CABLE ROUTING 142 ...
Page 344: ...SPEC CABLE ROUTING 144 ...
Page 346: ...SPEC CABLE ROUTING 146 ...
Page 348: ...SPEC CABLE ROUTING 148 ...
Page 350: ......
Page 351: ......
Page 352: ...2005 07 E F Sw ITP ...