![Vigilantplant TDLS8000 User Manual Download Page 48](http://html1.mh-extra.com/html/vigilantplant/tdls8000/tdls8000_user-manual_1022489048.webp)
<3. Installation, Wiring, Optical Axis Adjustment, and Piping>
3-3
IM 11Y01D01-01EN
3.1.2
Constructing Process Flanges
Please prepare your own process flanges.
n
Process Flange Reinforcing Plate
If the duct or the wall of flue that the process flanges will be attached to is thin or may bend, weld
large reinforcing plates around the area where the flanges will be attached. Figure 3.1 shows an
example of welding reinforcing plates. Provide a secure platform to install the TDLS8000 on at
your discretion.
Wall containing the measured gas
Side view
Front view
Approx. 10 mm thick steel plate (welded)
Reinforcing plate
(welded)
LU or SCU
Figure 3.1
Reinforcing plate for LU and SCU process flanges
CAUTION
Duct or flue with thin and easily bent walls must be reinforced to maintain laser beam alignment
at all times. Reinforce the process flanges to maintain alignment.
3rd Edition: Jun. 10, 2016-00
Summary of Contents for TDLS8000
Page 10: ...ix IM 11Y01D01 01EN LT LV PL EST SLO H BG RO M CZ SK 3rd Edition Jun 10 2016 00...
Page 25: ...Blank Page...
Page 45: ...Blank Page...
Page 115: ...Blank Page...
Page 151: ...Blank Page...
Page 231: ...Blank Page...
Page 239: ...Blank Page...
Page 243: ...Blank Page...
Page 261: ...Blank Page...
Page 303: ......
Page 305: ......
Page 307: ......
Page 309: ......
Page 311: ......
Page 313: ...Blank Page...