2000 MS Hardware Maintenance
46
Chemical Ionization Options
Schematic Diagram of the MCI Module
Multiple CI Module (shown with and without cover)
Pre-Installation Checklist
1. Preparing the Mass Spec
a. The Saturn MS should be shut down, vented, and unplugged.
2.
Tools Required
a. #2 Philips screw driver
b. Small tipped straight screw driver
c. 5/32 in or 4 mm drill bit
d. Electric
drill
e. Side cutters to cut Tygon
tubing
Installing the Multiple CI Assembly
1. Run the Saturn Software.
2. Select Shutdown and wait for the system to shut down.