![V-TEK TM-500 User Manual Download Page 145](http://html2.mh-extra.com/html/v-tek/tm-500/tm-500_user-manual_3085677145.webp)
5-12
TM-500 User’s Guide
Preparing to Run a Pre-programmed Job
D292144.8.fm
Note:
For further instructions on Vision System use, see
Chapter 4: Setup
or the
Keyence User’s Guide
which is provided with the 2D Vision Module.
10.
Leave the
IV Navigator
program in
Run Mode
and press
Alt + Tab
to toggle back
to the TM-500 HMI. Open the
Run Tab.
Enter
Job Quantity
and
Job Name.
Press
Run
to begin operation.
Since the TM-500 automatically inspects for the last job that was run, when the first
part in the new job will trigger an
Inspection Fail
.
Summary of Contents for TM-500
Page 2: ...European Representative QNET BV Hommerterweg 286 6436 AM Amstenrade The Netherlands...
Page 17: ...Contact Information D292144 2 fm xiv...
Page 21: ...Table of Contents D292144 3a fm...
Page 47: ...2 14 TM 500 User s Guide Dual Tray Feeder Input Output Module D292144 5 fm...
Page 83: ...3 36 TM 500 User s Guide The Setup Screens D292144 6 fm...
Page 187: ...7 14 TM 500 User s Guide Ethernet Networks D292144 10 fm...