Gear Pump (P3) Flow Test (Using Tester with Flow Meter and
Pressure Gauge) (5410/5410-G/5410-D/5510/5510-G/5510-D/5610)
g230020
Figure 87
The gear pump (P3) flow test should be performed to ensure that the traction
charge circuit and steering circuit have adequate hydraulic flow.
Test Procedure
1. Park machine on a level surface with the cutting units lowered and
disengaged. Ensure that the engine is shut off. Apply the parking brake.
2. Read all Warning, Cautions, and precautions listed at the beginning of this
section.
Reelmaster
®
5410/5510/5610 Series
Page 6–65
Hydraulic System: Testing the Hydraulic System
15216SL Rev C
Summary of Contents for Reelmaster 5510 Series
Page 4: ...NOTES NOTES Page 4 Reelmaster 5410 5510 5610 Series 15216SL Rev C...
Page 10: ...Preface Page 10 Reelmaster 5410 5510 5610 Series 15216SL Rev C...
Page 18: ...Safety Safety and Instructional Decals Page 1 8 Reelmaster 5410 5510 5610 Series 15216SL Rev C...
Page 356: ...Hydraulic System Service and Repairs Page 6 238 Reelmaster 5410 5510 5610 Series 15216SL Rev C...
Page 594: ...Cutting Unit Service and Repairs Page 9 64 Reelmaster 5410 5510 5610 Series 15216SL Rev C...
Page 662: ......