6-90
DVW-250/250P
(7) Turn the manual eject gear counterclockwise
and put the unit into the unthreading end
mode.
(8) Install the S arm using a new stop washer (3-
669-465-01).
5. Operation check
Turn the manual eject gear clockwise and coun-
terclockwise, and check that the threading and
unthreading are performed smoothly.
6. Cleaning
Clean the tape guide using a cleaning cloth
moistened with cleaning fluid.
Adjustment after replacement
7. Tape path adjustment
(Refer to Section 7-1-1.)
6-23. S Arm Assembly Replacement