8-8
DVW-250
8-6. EQ-54 Board Replacement
Removal
1.
Remove the battery case. (Refer to “1-5. Removal/
Installation of Cabinet ”.)
2.
Remove the two screws fixing the EQ-54 board and
plate blind, and then disconnect the connectors CN301
through CN304.
n
Do not load to the brush.
3.
Slide the EQ-54 board in the direction indicated by the
arrow and disconnect the board-to-board connectors
CN906 and CN907.
Note During Installation
• When connecting the harness to CN304 on the EQ-48
board, twist the connection harness five turns or more,
and connect it to CN304.
8-7. DC/DC Converter Removal
1.
Remove the top panel, bottom plate and battery case.
(Refer to “1-5. Removal/Installation of Cabinet”.)
2.
Remove the three screws fixing the DC/DC converter.
3.
Disconnect the connector CN601 and fasten terminal
CN602, and then remove the DC/DC converter from
the unit.
(CN602 disconnection : Pinch the terminal and pulled
out.)
DC/DC converter
Screw
(PWH2.6
×
5)
CN601
Fasten terminal
Screw
(PWH2.6
×
5)
Screw
(PWH3
×
6)
8-6. EQ-54 Board Replacement
8-7. DC/DC Converter Removal
CN906
CN907
EQ-54 board
Screw
(PWH2.6
×
5)
Screw
(PWH2.6
×
5)
CN304
CN302
CN303
Plate blind
CN301
Brush