6-18
DVW-250/250P
6-4. Upper Drum Assembly Replacement
(4) Put the four screws (removed in step 4) in the
four holes on the board of the upper drum
assembly using a pair of tweezers.
(5) Using an L wrench thread the four screws
tentatively in the sequence shown in the
figure. Do not tighten them.
7. Upper drum eccentricity gauge
installation
(1) Clean the probe of the gauge with a cleaning
cloth moistened with cleaning fluid.
m
• If the prove were dirty, upper drum may
scratch during adjustment.
• If the prove were made of metal, it recom-
mends that the lubricated protective tape
puts on the prove to prevent from the
scratching.
(2) Attach the gauge shown in the figure and
adjust so that the probe is positioned between
the bottom two grooves of the five which
locate on the outside of the upper drum
assembly.
n
Take care not to touch the probe against the
video heads.
3
2
4
1
Screw
Tape
Tape (3mm width)
Probe
Upper drum eccentricity adjustment tool
(assembled)
Upper drum
Probe
2nd groove from bottom
1st groove from bottom