6-95
DVW-250/250P
6-25. Replacement of the Component Parts of the
Threading Link Block
Overviews
Replacement
SE-233 board removal
Unthread guide plate removal
Disconnection brush assembly connector
Drum assembly removal
S arm assembly removal
T drawing arm assembly removal
Drawing arm gear removal
Catcher S/T removal
Threading link assembly removal
Slider S/T removal
Threading gear assembly removal
T threading gear assembly installation
S threading gear assembly installation
Slider S/T installation
Threading link assembly installation
Catcher S/T installation
Drawing arm gear installation
T drawing arm assembly installation
S arm assembly installation
Drum assembly installation
Connection brush assembly connector
Unthread guide plate
SE-233 board installation
Cleaning of the heads and the tape running surface
Adjustment after this repiacement
Tension regulator adjustment
Tape path adjustment
Reference:
This section describes the replacement procedure of the drawing arm gear, catcher S/T,
slider S/T, threading gear assembly S/T, ST driving gear, and ST driving middle gear.
And it is explained in this section that the phase adjustment of the intermittent gear.
Preparations
1.
Check that the unit is in unthreading end mode.
2.
Turn the power off.
3.
Remove the top panel. (Refer to section 1-5)
n
When replacing, prepare new stopwashers (3-726-829-01) and new E-rings (7-624-
102-01).
6-25. Replacement of the Component Parts of the Threading Link Block