![Siemens SINAMICS G120P Operating Instructions Manual Download Page 467](http://html.mh-extra.com/html/siemens/sinamics-g120p/sinamics-g120p_operating-instructions-manual_378189467.webp)
Maintenance and servicing
10.6 Load the firmware or language packages for the IOP
Inverter cabinet units
Operating Instructions, 12/2014, A5E32923362A
467
Procedure
You can take the details about the measures required when forming from the following
diagram.
Storage times less than 1 year: No measures required
①
Storage times of between 1 and 2 years: Connect voltage for one hour before switching on
②
Storage times of between 2 and 3 years: Form corresponding to the curve before switching on
③
Storage times of 3 and more years: Form corresponding to the curve before switching on
Figure 10-8 Measures when forming the DC-link capacitors
10.6
Load the firmware or language packages for the IOP
The loading of the firmware or language packages for the IOP is described at the following
link:
http://support.automation.siemens.com/WW/view/en/30563514/133100
Summary of Contents for SINAMICS G120P
Page 1: ......
Page 2: ......
Page 8: ...Preface Inverter cabinet units 8 Operating Instructions 12 2014 A5E32923362A ...
Page 16: ...Table of contents Inverter cabinet units 16 Operating Instructions 12 2014 A5E32923362A ...
Page 432: ...Application examples Inverter cabinet units 432 Operating Instructions 12 2014 A5E32923362A ...
Page 496: ......