Commissioning
5.5 Procedure for commissioning via STARTER
Inverter cabinet units
148
Operating Instructions, 12/2014, A5E32923362A
Figure 5-6
Create new project
⇒
Enter a project name and, if necessary, the author, memory location and a comment.
⇒
Click Continue > to set up the PG/PC interface.
Figure 5-7
Set up interface
⇒
Click on Access point ..., to set the access point to the drive device.