In just a few steps to the first project
1-2
System- and communication configuring D7-SYS - SIMADYN D
Edition 12.2001
1.1 Prerequisites
These brief instructions are intended for introductory level personnel and
it outlines the basic procedure when generating a project.
More detailed information about the dialog boxes of the development
software and their processing is provided in the corresponding online
help.
1.1.1
Software and hardware
Three software packages
•
STEP
7
•
CFC
•
D7-SYS
must be installed precisely in this sequence on your PG/PC with
Windows 95/98/ME/NT 4.0/2000. Authorization is required for STEP7 and
CFC.
NOTE
The installation and user instructions are provided in the particular
"readme" files. Please observe the interdependencies between
versions!
When installing STEP7, you will be prompted for the online interface,
however, for SIMADYN D nothing has to be selected and installed.
("Close" window and exit the following window with "OK".)
You will require the following hardware components for the "My First
Project” project example:
Components
Function
Diagram/Order No.
SR6 subrack
with power supply
6 slots, backplane PC board with
L bus, without fan
... if the subrack is for a
SIMADYN D station.
... it is used to mechanically
accommodate the modules and
supply them with power.
6DD1682-0BB0
CPU module PM5
(at slot 1)
... executes the user program.
... exchanges data with other
modules via the backplane PC
board of the subrack.
... communicates with a PG/PC
via the serial interface.
6DD1600-0AJ0
Introduction
Software
Hardware