5–16
Alignments and Adjustments
Hammer Tip Alignment
(Figure 5–6)
1. Remove the ribbon deck assembly as described on page 6–8 of Chapter
6, Replacement Procedures.
2. Perform steps 1 and 2 of the hammer spring removal procedure, as
described on page 6–22 of Chapter 6, Replacement Procedures. This will
place the hammer bank in the service position.
3. Loosen the screw (1) of the hammer spring (2) to be aligned.
4. Place the alignment tool (3; P/N 132266–001) over the hammer tips.
Move the hammer spring until the tip is in an appropriate hole in the
alignment tool.
5. Torque the screw to 6 to 8 in–lbs and remove the tool.
6. Return the hammer bank to the operating position as described on page
6–24 of Chapter 6, Replacement Procedures.
7. Install the ribbon deck assembly as described on page 6–8 of Chapter 6,
Replacement Procedures.
Summary of Contents for P9012
Page 1: ...P N 132305 001 Rev E P9012 Multifunction Line Printer...
Page 49: ...2 31 Principles of Operation Power Supply PCBAs 1 3 SHORT OPEN Figure 2 21 Power Supply PCBA...
Page 58: ...2 40 Principles of Operation...
Page 84: ...4 18 Troubleshooting...
Page 118: ...5 34 Alignments and Adjustments...
Page 203: ...6 85 Replacement Procedures This page intentionally left blank...
Page 214: ...6 96 Replacement Procedures...
Page 236: ...A 22 Power Paper Stacker Maintenance...
Page 246: ...D 2 Torque Table...
Page 254: ...Index 6...
Page 255: ......
Page 256: ...132305 001 Rev E...