System Product Guide
5-9
Installing an OverDrive
Processor
This section tells how to install an OverDrive processor upgrade in your
system. Be sure to read the “Clearance Requirements” section below before
installing a processor upgrade in your system.
▲
▲
!
CAUTION
You do not need to change any jumpers to install an
OverDrive processor upgrade.
Clearance Requirements
The OverDrive processor comes with a heat sink mounted on top. To
maintain proper airflow once the upgrade is installed in the system, the
processor and heat sink require certain clearances. Table 5-3 shows the
required clearances.
Table 5-3. Clearances for OverDrive
Processor Upgrades
Location
Minimum Clearance
Clearance above the top of the OverDrive
processor’s heat sink
0.4 inches
Clearance on at least 3 of the 4 sides of the
upgrade processor
0.2 inches
Summary of Contents for apricot VS660
Page 1: ...SYSTEM PRODUCT GUIDE VS660 apricot MITSUBISHI ELECTRIC ...
Page 2: ...Mini Tower System Product Guide ...
Page 51: ......
Page 55: ...4 4 Taking Your System Apart OM04061 A B A Figure 4 1 Removing the Side cover ...
Page 75: ......
Page 86: ...System Product Guide 5 11 OM03834 Figure 5 3 Removing the CPU Clamp ...
Page 138: ......
Page 139: ......
Page 141: ......
Page 145: ......