METRODATA NetTESTER FAMILY USER MANUAL
76-02-107 Rev.A
Page 92 of 133
The configuration test phase is intended to be a rapid check of the defined SLA and
performs a series of short tests to validate it. The configuration test menu is as
shown below:
CONFIGURATION TEST
Test time 3s
Cir test Step-Load
eIr test Perform
Policing test Perform
cBs test Perform
Ebs test Perform
14.2.6.4.5.1 Test Time
Menu Tree: Main Set-Up /
T
esting /
S
AM Tester /
T
est Parameters / Co
N
figuration Test /
T
est Time
During the configuration test phase, each test will run for this period. The purpose of
the configuration tests is to validate that the basic SLA can be achieved so this time
should be fairly short, but long enough to give a valid view of the network.
Values should be entered in one of the standard time period formats (see section
13.3.1). The default value is 3 seconds.
14.2.6.4.5.2 CIR Test
Menu Tree: Main Set-Up /
T
esting /
S
AM Tester /
T
est Parameters / Co
N
figuration Test /
C
IR Test
The CIR test verifies that traffic may be generated at the configured CIR and meet
the frame loss configuration.
The options for CIR test are
Step-Load
Test at 25%, 50%, 75% and 100% of CIR
Simple
Test at 100% of CIR only
Skip
Do not perform the CIR test
14.2.6.4.5.3 EIR Test
Menu Tree: Main Set-Up /
T
esting /
S
AM Tester /
T
est Parameters / Co
N
figuration Test / E
I
R Test
This test generates traffic at the full CIR+EIR rate.
The options for EIR test are
Perform
Perform the EIR test
Skip
Do not perform the EIR test
The EIR test will be automatically skipped if no EIR is defined.
14.2.6.4.5.4 Policing Test