2. Engage header by pushing and holding the HEADER
ENGAGE switch (A), and pulling up on the collar (B).
Figure 4.233: Header Engage Switch
3. Select one of the following deck positions using the
DECK SHIFT switches on the operator’s console:
• Right-side delivery (A)
• Center delivery (B)
• Left-side delivery (C)
Figure 4.234: Header Deck Shift Switches
4. After deck(s) have stopped moving, disengage header
with HEADER ENGAGE switch (A).
Figure 4.235: Header Engage Switch
5. Refer to
to adjust the
fl
oat
setting for the selected deck position.
6. Repeat steps for the other deck positions.
214053
214
Revision A
Summary of Contents for M1240
Page 29: ...SAFETY 1 11 Safety Sign Locations Figure 1 31 Safety Sign Locations 214053 17 Revision A ...
Page 40: ......
Page 116: ......
Page 246: ......
Page 352: ...MAINTENANCE AND SERVICING Figure 5 175 Main Fuse Panel Decal MD 207815 214053 340 Revision A ...
Page 370: ......
Page 388: ......
Page 487: ......