![MacDon M1240 Operator'S Manual Download Page 124](http://html.mh-extra.com/html/macdon/m1240/m1240_operators-manual_685727124.webp)
6. Check the entire A/C system for leakage at the beginning of each season.
7. Perform annual maintenance. Refer to
5.2 Windrower Break-In Inspections and Maintenance Schedule, page
Air Conditioning Compressor Coolant Cycling
IMPORTANT:
Perform the following steps whenever the machine is
fi
rst started after storage for more than one week:
1. Press the reduce (–) BLOWER SPEED switch (A)
repeatedly until the lowest fan setting is reached.
2. Press the red area on the TEMPERATURE CONTROL
switch (F) repeatedly until maximum heating is
reached.
3. Press the A/C control (E) to OFF.
4. Start engine and operate at low idle until engine
is warm.
Figure 4.6: Climate Control
A - Blower Toggle Button
B - Outside Air Button
C - Recirculating Air Button
D - Windshield Defog/Defrost
E - Air Conditioning Button
F - Temperature Control
4.3.4 Daily Checks and Maintenance
Perform the following checks and recommended maintenance before operating the windrower every day:
1. Check the machine for leaks.
NOTE:
Use proper procedure when searching for pressurized
fl
uid leaks. Refer to
.
2. Check for missing or broken parts.
3. Clean the windows and mirrors to ensure good visibility in all directions. Stand on the platform to access the
rear window. Hold onto the handholds on the cab front corners and stand on the header anti-slip strips to wash
the front window.
4. Clean all lights and re
fl
ective surfaces to maintain visibility to others.
214053
112
Revision A
Summary of Contents for M1240
Page 29: ...SAFETY 1 11 Safety Sign Locations Figure 1 31 Safety Sign Locations 214053 17 Revision A ...
Page 40: ......
Page 116: ......
Page 246: ......
Page 352: ...MAINTENANCE AND SERVICING Figure 5 175 Main Fuse Panel Decal MD 207815 214053 340 Revision A ...
Page 370: ......
Page 388: ......
Page 487: ......