CentreVu Supervisor Version 8 Installation and Getting Started
Using CentreVu Supervisor Reports
Selecting Report Run Times
7-10
Selecting Report Run Times
7
When you run interval historical reports, you need to select the time period for
which to run the report. In the report input window, do any of the following:
●
Type the time range in the Times: input field.
●
Select the times from the history list of previously used times for this
report.
●
Select the Browse button
next to the Times: field.
If you select the Browse button, the following window displays:
Complete the following fields:
— Starting Interval—select the time you want the report to begin with
from the drop-down list. The report data will begin with the interval
that begins immediately after the time you enter.
— Ending Interval—select the time you want the report to end with
from the drop-down list. The report data will go through the interval
that falls within the time you enter.
Summary of Contents for CentreVu Supervisor
Page 6: ...Introduction...
Page 12: ...CentreVu Supervisor Version 8 Installation and Getting Started xii...
Page 270: ...CentreVu Supervisor Version 8 Installation and Getting Started Overview A 8...
Page 284: ...CentreVu Supervisor Version 8 Installation and Getting Started GL 14...
Page 306: ......