108
LAS AF
Figure 87:
Overview of the FLIM Wizard steps
• "
Setup Corr-ring
" step Some immersion objectives have a correction ring to optimally
correct for differences in the refractive index between immersion and specimen and
temperature effects. An optimum adjustment of the correction ring correlates with the
best possible optical resolution of the system. In the
Setup Corr-ring
step, the beam path
is preconfigured for a fast and efficient adjustment of the correction ring.
•
Setup Imaging
workstep: Here, you can establish and optimize the conditions for the
acquisition of a reference image. In the
Setup Imaging
step, the FLIM data acquisition
cannot be started.
• Step
Setup FLIM
: Here, you can define and optimize instrument parameters for the FLIM
measurement. The FLIM measurement instrument parameters (such as selection of the
laser line and intensity, image size, pinhole size, etc.) are managed independently of the
parameters for image acquisition in the
Setup Imaging
step. The optimal laser intensity
can be determined with a FLIM test measurement (selecting the
FLIM Test
button).
• Step
Measurements
: Here, you can define the FLIM experiment (exposure time of the
individual FLIM images, definition of FLIM volume stacks, FLIM time series or, for internal
SP FLIM, FLIM lambda stacks).
Summary of Contents for TCS SP8 SMD
Page 1: ...10 Living up to Life User Manual Leica TCS SP8 SMD for FCS FLIM and FLCS ...
Page 4: ...4 Copyright ...
Page 14: ...14 Contents ...
Page 18: ...18 Intended Use ...
Page 20: ...20 Liability and Warranty ...
Page 28: ...28 General Safety Notes ...
Page 32: ...32 Additional Notes on Handling the System ...
Page 44: ...44 System Overview and Properties ...
Page 60: ...60 SMD Components Figure 31 DSN 102 Dual SPAD Power Supply ...
Page 80: ...80 Safety Features ...
Page 102: ...102 Switching On the System ...
Page 116: ...116 LAS AF ...
Page 214: ...214 Changing the Specimen ...
Page 216: ...216 Changing the Objective ...
Page 238: ...238 Switching Off the System ...
Page 242: ...242 Repairs and Service Work ...
Page 244: ...244 Maintenance ...
Page 246: ...246 Disassembly and Transport ...
Page 248: ...248 Disposal ...
Page 254: ...254 Contact ...
Page 256: ...256 Recommended Literature ...
Page 266: ...266 Appendix Figure 225 Declaration of conformity ...
Page 268: ...268 Appendix ...
Page 269: ......