Page 42
Transport/Start up
Group 5
Release R1.06
JET3up
Figure 4
Movable base frame for JET3up
For this it is expedient to place the device on a device support.
The device has four fastening possibilities for secure seting up and should be screw
connected at the place of setting up.
Figure 5
Fastening posibilities
ATTENTION
A place of setting up with sufficient load bearing capacity and stability
must be chosen. Prior to assembly the place of setting up must be
cleaned of dirt and contamination (residue of lubricants etc.).
120
120
355
Summary of Contents for JET3 up
Page 1: ...Operating Manual V1 06 Please keep for future reference ...
Page 2: ......
Page 18: ...Page 16 Introduction Group 1 Release R1 06 JET3up ...
Page 31: ...Group 2 Safety Page 29 JET3up Release R1 06 ...
Page 37: ...Group 3 Accident prevention Page 35 JET3up Release R1 06 ...
Page 42: ...Page 40 Accident prevention Group 4 Release R1 06 JET3up ...
Page 396: ...Page 394 Appendix List of illustrations Group 12 Release R1 06 JET3up 12 4 2 Print head SK 6 ...
Page 398: ...Page 396 Appendix List of illustrations Group 12 Release R1 06 JET3up 12 4 4 Cabinet LJ ...