Step 2: If the device is a network card and the switch is in the wiring closet, attach the other end of the cable segment
to a modular wall outlet that is connected to the wiring closet. (See the section “Network Wiring Connections.”) Otherwise,
attach the other end to an available port on the switch.
Make sure each twisted pair cable does not exceed 100 meters (328 ft) in length.
5
Avoid using flow control on a port connected to a hub unless it is actually required to solve a problem. Otherwise
back pressure jamming signals may degrade overall performance for the segment attached to the hub.
Step 3: As each connection is made, the Link LED (on the switch) corresponding to each port will light green (1000 Mbps)
or amber (100 Mbps) to indicate that the connection is valid.
NETWORK WIRING CONNECTIONS
Today, the patch-down block is an integral part of many of the newer equipment racks. It is actually part of the patch
panel. Instructions for making connections in the wiring closet with this type of equipment follows.
Step 1: Attach one end of a patch cable to an available port on the switch, and the other end to the patch panel.
Step 2: If not already in place, attach one end of a cable segment to the back of the patch panel where the punch-down
block is located, and the other end to a modular wall outlet.
Step 3: Label the cables to simplify future troubleshooting. See “Cable Labeling and Connection Records”.
Figure 17: Network Wiring Connections
11
LANCOM GS-2310P/GS-2326(P) User Manual
2 Operation of Web-based Management