1. Introduction
4 TSα Series User Manual
1.2
Robot Body
Kick
Main and Sub Arm
forward and backward
Traverse
For traverse
movement
Main Arm
For Up/Down Movement
Sub Arm
Taking out sprue
Sub Arm Grip
Jig Unit
Control Box
Servo Controller etc.
are installed.
Regulator
Reulator and air filter
are installed.
Valve Box
Solenoid Valve and Signal
I.O and Vacuum Sensor are
installed.
Summary of Contents for TS-200DI
Page 2: ......
Page 14: ...xii...
Page 15: ...xiii...
Page 19: ......
Page 20: ......
Page 21: ...1 Introduction...
Page 22: ......
Page 28: ......
Page 29: ...2 Before Operation...
Page 30: ......
Page 41: ...3 START UP STOP...
Page 42: ......
Page 47: ...4 OPERATION...
Page 48: ......
Page 114: ......
Page 115: ...5 Follow Up...
Page 116: ......
Page 126: ......
Page 127: ...6 Error...
Page 128: ......
Page 134: ......
Page 135: ...Appendix...
Page 136: ......
Page 143: ......