
FluoroMax-3 v. 3.1 (6 Mar 2006)
Automated Polarizers
10-5
Installation
Spex
®
polarizers are made for easy installation and removal from the light path. All of
the polarizers use pinned collars to hold the polarizers in their mounts and maintain
calibration when the polarizers are removed.
New instrument and complete-polarizer orders are shipped with pre-aligned polarizers
marked for excitation (“X”) or emission (“M”), and are locked in their collars.
Store the polarizer crystals in a dust-free environment, in a cabinet or drawer.
Proceed to “Alignment” in this chapter to verify alignment of the polarizers.
Caution:
When the polarizers are shipped inside an in-
strument, the polarizers are aligned and calibrated at
the factory. Do not remove polarizers from their col-
lars, or else the polarizer must be realigned.
Summary of Contents for FluoroMax-3
Page 5: ...FluoroMax 3 v 3 1 3 Mar 2006 v 15 Declaration of Conformity 15 1 16 Index 16 1...
Page 6: ...FluoroMax 3 v 3 1 3 Mar 2006 vi...
Page 18: ...FluoroMax 3 v 3 1 3 Mar 2006 Introduction 0 12...
Page 36: ...FluoroMax 3 v 3 22 Feb 2005 System Description 2 8...
Page 96: ...FluoroMax 3 v 3 1 3 Mar 2006 Maintenance 6 12...
Page 156: ...FluoroMax 3 v 3 1 6 Mar 2006 Automated Polarizers 10 22...
Page 208: ...FluoroMax 3 v 3 1 6 Mar 2006 Bibliography 14 4...
Page 210: ...FluoroMax 3 v 3 1 6 Mar 2006 Declaration of Conformity 15 2...