HLP-C100 Series Operating Manual
HLP-C100 Series
-
8
-
Chapter 3 Installation and wiring
3.1 Checks before Installation
The inver ter has been strictly and well packed bef ore sold. In
consideration of various factors during the transportation special attention
should be paid to the following points before installation. If there is anything
abnormal please notif y the dealer or the relevant people of our company.
●
Check if the inverter has got any damage or deformation during the
transportation and handling;
●
Check if there is one piece of HLP-C100 series inverter and one copy of
the quick guide available when unpacking it;
●
Check the information on the label to see if the speci
fi
cations meet your
order (Operating voltage and KW value);
●
Check if there is a certi
fi
cate of quali
fi
cation and a warranty card.
3.2 Installation Dimensions
3.2.1 Dimensions of LCP
59.5
21.7
57.1
12.8
13.3
92.6
89.2
Dimensions of the LCP are shown below(unit:mm):