
System Options:
Quick Loader
9-78
INSTALLATION
The Quick loader is pre-installed in FEI factory. No special adjustment
is needed only the loading rod was uninstalled for transport.
1.
Unpack the lead glass lid.
2.
Remove four screws holding the cover of the loading rod
feedthrough.
3.
Use the same screws to attach the loading rod to the loader
chamber.
Loading position
The load / unload position is preset from factory. If a calibration is
needed, run the alignment
350 - Quick Loader Alignment
at first.
Summary of Contents for Quanta FEG 250
Page 8: ...C vi...
Page 28: ...System Operation Quanta FEG System States 3 10...
Page 108: ...Alignments 1 Gun Alignment 6 6...
Page 114: ...Alignments 154 Water Bottle Venting 6 12 154 Water Bottle Venting...
Page 152: ...System Options Automatic Aperture System 9 4...
Page 154: ...System Options Nav Cam 9 6 401 NAV CAM AUTOBRIGHTNESS...
Page 177: ...System Options Cooling Stage Waterless Cooling Stage 9 29...