System Options:
Heating Stage 1000 °C / Heating Stage 1500 °C
9-40
HEATING STAGE INSTALLATION
1.
Remove an actual (if any) sample holder adapter.
2.
Install the dovetail included onto the stage rotation base (if it is not
in place) parallel to the door opening direction.
3.
Slide the stage module onto the dovetail base from the rear
forward, until it stops (
1
). The stage has a pin which ensures the
sample is centred beneath the beam.
Note:
Hoses must be oriented towards the chamber back always.
4.
Tighten the locking screw on the stage assembly right side (
2
).
FIGURE 9-34
INSTALLING THE HEATING STAGES
Cables and Water Hoses connection
5.
Connect the 15-pin connector of the 4-ended Inner / Outer cable to
the appropriate feed-through plate connector.
Note:
Check the inner cable corresponds with the stage type.
6.
Connect the
Heater power
,
Thermocouple
and
Sample Bias
(for
HS 1500) connectors. Also plug the water hoses.
FIGURE 9-35
CONNECTIONS TO THE HEATING STAGE
7.
The greater spherical Chamber Interface 4-ended cable connector
fits to the outside of the Chamber feed-through plate, on the
connector labeled Heating stage. (The lesser spherical connector
works with the CS.)
8.
The 25-pin connector fits to the HS Controller and the 9-pin
connector to the SSB (only for HS 1500).
The Water Flow Box installation and Operation
Same as for the Cooling stage (see above).
Summary of Contents for Quanta FEG 250
Page 8: ...C vi...
Page 28: ...System Operation Quanta FEG System States 3 10...
Page 108: ...Alignments 1 Gun Alignment 6 6...
Page 114: ...Alignments 154 Water Bottle Venting 6 12 154 Water Bottle Venting...
Page 152: ...System Options Automatic Aperture System 9 4...
Page 154: ...System Options Nav Cam 9 6 401 NAV CAM AUTOBRIGHTNESS...
Page 177: ...System Options Cooling Stage Waterless Cooling Stage 9 29...