B • Installation
Doc. 065125-01 10/06
67
2. Push a mounting stud (provided with the standards rack) into each of
the mounting holes.
3. Position the standards rack over the three mounting studs and push
the rack firmly onto the mounting studs to secure it into place.
B.3.6
Installing the Sample Rack
The AS-HV is shipped with a 24-position sample rack (P/N 064233). An
optional 15-position sample rack (P/N 064234) is available, also.
Place the sample rack on top of the rack location mat in the autosampler.
B.3.7
Installing the Trace Analysis Cover (Optional)
The Plexiglas trace analysis cover is shipped as a ready-to-assemble kit
(P/N 064052). Use the sliding door in the cover for access when loading
or removing racks.
1. Follow the instructions provided in the kit to assemble the cover.
2. Place the assembled cover over the AS-HV.
3. The cover has provision for an optional purge connection and/or an
exhaust outlet to remove corrosive or solvent fumes. Dionex
recommends using helium or nitrogen at very high purity (99.999%)
as the purge gas.
Summary of Contents for AS-HV
Page 1: ...AS HV Autosampler Operator s Manual Document No 065125 Revision 01 October 2006...
Page 8: ...AS HV Operator s Manual vi Doc 065125 01 10 06...
Page 28: ...AS HV Operator s Manual 20 Doc 065125 01 10 06...
Page 54: ...AS HV Operator s Manual 46 Doc 065125 01 10 06...
Page 66: ...AS HV Operator s Manual 58 Doc 065125 01 10 06...
Page 92: ...AS HV Operator s Manual 84 Doc 065125 01 10 06...
Page 116: ...AS HV Operator s Manual 108 Doc 065125 01 10 06...