![background image](http://html.mh-extra.com/html/accu-chek/inform-2/inform-2_operators-manual_455938039.webp)
Patient Glucose Testing
38
Preparing to test
For more detailed information regarding the
ACCU-CHEK Inform II test strip, refer to the package
insert for instructions for use, performance
characteristics, and limitations of the system.
The following requirements must be met before you can
perform a test:
n
The ACCU-CHEK Inform II test strips are available.
n
At least one code file for test strips must be stored
in the meter and match the lot number of the test
strips used (see Chapter 6).
n
An operator ID must be entered (with password, if
required), if the meter is configured for login.
n
Glucose control tests specified in the system
configuration must be run and completed
successfully before running patient tests.
Information whether glucose control tests are
necessary is displayed in the
Power Up
screen.
n
If configured, the meter may require downloading
stored data to the data management system within
defined time intervals. If such a download (either
via WLAN or by docking the meter in a base unit)
does not happen within the specified time, the
meter is locked (
Download Lockout
) and cannot be
used for testing.
If a glucose control test is shown as required, patient
glu cose testing cannot be performed until the controls
are run successfully.
Depending on how your meter is configured, QC
Lockout occurs when
n
patient testing is attempted and controls have
not been run in the time interval or frequency
established by your facility.
n
controls have been run but the control values
were not in range.
n
a test strip lot other than the “current’ lot is
selected.
n
new software has been installed.
Docked
Synchronizing Database...
12:48 pm
09/18/13
Summary of Contents for Inform 2
Page 1: ...ACCU CHEK Inform II BLOOD GLUCOSE MONITORING SYSTEM Operator s Manual ...
Page 3: ......
Page 11: ... 10 This page intentionally left blank ...
Page 65: ...Glucose Control Testing 64 This page intentionally left blank ...
Page 91: ...Linearity Testing 90 This page intentionally left blank ...
Page 99: ...Proficiency Testing 98 This page intentionally left blank ...
Page 149: ...General Product Information 148 This page intentionally left blank ...
Page 167: ...Appendix 166 This page intentionally left blank ...
Page 191: ...Supplement for Observed Test Sequence 190 This page intentionally left blank ...
Page 197: ... 196 This page intentionally left blank ...
Page 198: ......