![background image](http://html.mh-extra.com/html/accu-chek/inform-2/inform-2_operators-manual_455938104.webp)
Initial Startup
103
5
Close the battery compartment with the cover.
6
Tighten all three screws until snug (do not
overtighten).
After inserting a new battery pack, the meter powers on
automatically.
n
The Roche logo is displayed. If the meter does not
power on automatically, the battery pack may be
nearly empty. Place the meter in a base unit for a
minimum of 15 minutes, then remove the meter
and try to power it on. If it powers on, the battery
pack is charging properly.
n
Within a short period of time, the start screen
should appear.
n
If the meter has been without power for too long, a
message may appear informing you that the date
and time settings have been lost due to power loss.
n
The screens for entering the date and the time
appear.
7
Enter the date and time. After you have entered the
correct information, confirm each screen with
n
Unless your QC configuration is Always OK, the
meter will now be in QC Lockout due to the
manually entered date/time.
8
Synchronize the meter’s date/time with the date/
time of your facility via base unit or, if working
wirelessly, wait at least 10 minutes for the next
WLAN synchronization before performing any
further tests.
After installing a new battery pack, the meter should be
charged for three hours in the base unit before testing.
1
2
3
4
5
6
7
8
9
0
Date
09/18/13
09/30/13
12:48 pm
1
2
3
4
5
6
7
8
9
AM/PM
0
Time
12:48 pm
09/18/13
12:15 pm
Summary of Contents for Inform 2
Page 1: ...ACCU CHEK Inform II BLOOD GLUCOSE MONITORING SYSTEM Operator s Manual ...
Page 3: ......
Page 11: ... 10 This page intentionally left blank ...
Page 65: ...Glucose Control Testing 64 This page intentionally left blank ...
Page 91: ...Linearity Testing 90 This page intentionally left blank ...
Page 99: ...Proficiency Testing 98 This page intentionally left blank ...
Page 149: ...General Product Information 148 This page intentionally left blank ...
Page 167: ...Appendix 166 This page intentionally left blank ...
Page 191: ...Supplement for Observed Test Sequence 190 This page intentionally left blank ...
Page 197: ... 196 This page intentionally left blank ...
Page 198: ......