Storing Test Strip, Control Solution, and Linearity Solution Information in the Meter
79
Storing linearity test information
Observe the applicable regulations and directives of the
responsible regulatory agencies when performing
linear ity tests.
Entering the lot number of the
linearity test
The following description assumes that the meter is
pow ered on and the main menu is displayed.
Main Menu
Review Results
Control Test
Patient Test
12:48 pm
09/18/13
Main Menu 2
Maintenance
Strip Lots
Profi ciency
Control Lots
Beeper
Linearity
Diagnostics
Linearity Lots
Admin.
12:48 pm
09/18/13
Linearity Lots
Add
* Lin. 12/31/13
777732
03/15/14
777723
Lin.
Type Exp. Date Lot Num.
12:48 pm
09/18/13
1
Touch
to open the
Main Menu 2
screen.
2
Touch
Linearity Lots
to open the related menu.
3
Touch
Add
to enter a new lot number.
Summary of Contents for Inform 2
Page 1: ...ACCU CHEK Inform II BLOOD GLUCOSE MONITORING SYSTEM Operator s Manual ...
Page 3: ......
Page 11: ... 10 This page intentionally left blank ...
Page 65: ...Glucose Control Testing 64 This page intentionally left blank ...
Page 91: ...Linearity Testing 90 This page intentionally left blank ...
Page 99: ...Proficiency Testing 98 This page intentionally left blank ...
Page 149: ...General Product Information 148 This page intentionally left blank ...
Page 167: ...Appendix 166 This page intentionally left blank ...
Page 191: ...Supplement for Observed Test Sequence 190 This page intentionally left blank ...
Page 197: ... 196 This page intentionally left blank ...
Page 198: ......