Supplement for Other Test Entry
178
The following steps must be completed already:
1
The meter is powered on.
2
You have entered your operator ID.
3
You have completed login by touching
and
the
Main Menu
screen is displayed.
Main Menu
Review Results
Control Test
Patient Test
12:48 pm
09/18/13
Other Control Tests
Pregnancy
Visual UA (MS)
Visual UA (CS)
Rapid Strep
Rapid DAT
09/18/13
12:48 pm
Control Test Menu
Glucose Control Test
Other Control Tests
09/18/13
12:48 pm
1
From the
Main Menu
screen touch
Control Test
.
2
From the
Control Test Menu
touch
Other Control
Tests
.
Other Control Tests
Pregnancy
Visual UA (MS)
Visual UA (CS)
Rapid Strep
Rapid DAT
09/18/13
12:48 pm
Pregnancy Control
Positive Liquid Control
Negative Liquid Control
09/18/13
12:48 pm
3
Select the desired test from the display list.
(
Pregnancy
control will be used as the example.)
4
Select the type (level) of control being used.
Summary of Contents for Inform 2
Page 1: ...ACCU CHEK Inform II BLOOD GLUCOSE MONITORING SYSTEM Operator s Manual ...
Page 3: ......
Page 11: ... 10 This page intentionally left blank ...
Page 65: ...Glucose Control Testing 64 This page intentionally left blank ...
Page 91: ...Linearity Testing 90 This page intentionally left blank ...
Page 99: ...Proficiency Testing 98 This page intentionally left blank ...
Page 149: ...General Product Information 148 This page intentionally left blank ...
Page 167: ...Appendix 166 This page intentionally left blank ...
Page 191: ...Supplement for Observed Test Sequence 190 This page intentionally left blank ...
Page 197: ... 196 This page intentionally left blank ...
Page 198: ......