![Accu-Chek Inform 2 Operator'S Manual Download Page 34](http://html.mh-extra.com/html/accu-chek/inform-2/inform-2_operators-manual_455938034.webp)
Powering Up and Entering an Operator ID
33
Enabling/disabling wireless
connectivity
If the meter supports wireless connectivity, you can
temporarily enable or disable this functionality as
required.
Wireless connectivity is automatically reactivated the next
time you power on the meter. You can then disable it
again tempo rarily, if required.
WARNING
If you suspect that the RF emisions of wirelss
communications are harming the patient or affecting
other devices, you should carefully reassess the
appropriateness of continued use of the WLAN
functionality of the ACCU-CHEK Inform II system using
the guidelines of your facility.
If wireless connectivity is activated, the
(
RF OFF
)
icon is dis played as a button in the
Power Up
screen.
n
To temporarily
disable
the wireless network
connection, touch
(
RF OFF
) in the
Power Up
screen. The icon then changes to
(
RF ON
).
n
To temporarily
enable
the wireless network
connection, touch
(
RF ON
) in the
Power Up
screen. The icon then changes to
(
RF OFF
).
The
RF ON/RF OFF
button always displays the
option
you
currently have. The current communication
status
is
dis played in the status bar (bottom line) of the display in
all menus and screens.
n
The icon is displayed, if wireless connectivity is
enabled.
n
The
icon is displayed if the last attempt to
communicate with the data management system
was successful and was terminated according to
the communication protocol.
n
The
icon is displayed if the last attempt to
communicate with the data management system
was not successful or was unintentionally
terminated. If this icon persists, contact your
system administrator. Ignoring this information may
lead to a
Download Lockout
(if configured, see
page 38).
Contrast
Power Up
12:48 pm
09/18/13
Contrast
Power Up
12:48 pm
09/18/13
Summary of Contents for Inform 2
Page 1: ...ACCU CHEK Inform II BLOOD GLUCOSE MONITORING SYSTEM Operator s Manual ...
Page 3: ......
Page 11: ... 10 This page intentionally left blank ...
Page 65: ...Glucose Control Testing 64 This page intentionally left blank ...
Page 91: ...Linearity Testing 90 This page intentionally left blank ...
Page 99: ...Proficiency Testing 98 This page intentionally left blank ...
Page 149: ...General Product Information 148 This page intentionally left blank ...
Page 167: ...Appendix 166 This page intentionally left blank ...
Page 191: ...Supplement for Observed Test Sequence 190 This page intentionally left blank ...
Page 197: ... 196 This page intentionally left blank ...
Page 198: ......