Troubleshooting
142
n
The screens for entering the date and the time
appear.
4
Enter the date and time. After you have entered the
correct information, confirm each screen
with
.
n
Unless your QC configuration is
Always OK
, the
meter will now be in QC Lockout due to the
manually entered date/time.
5
Meter may have to be docked in the base unit for
synchronization of the meter’s date/time with the
date/time of your facility.
1
2
3
4
5
6
7
8
9
0
Date
09/18/13
09/30/13
12:48 pm
1
2
3
4
5
6
7
8
9
AM/PM
0
Time
12:48 pm
09/18/13
12:15 pm
Summary of Contents for Inform 2
Page 1: ...ACCU CHEK Inform II BLOOD GLUCOSE MONITORING SYSTEM Operator s Manual ...
Page 3: ......
Page 11: ... 10 This page intentionally left blank ...
Page 65: ...Glucose Control Testing 64 This page intentionally left blank ...
Page 91: ...Linearity Testing 90 This page intentionally left blank ...
Page 99: ...Proficiency Testing 98 This page intentionally left blank ...
Page 149: ...General Product Information 148 This page intentionally left blank ...
Page 167: ...Appendix 166 This page intentionally left blank ...
Page 191: ...Supplement for Observed Test Sequence 190 This page intentionally left blank ...
Page 197: ... 196 This page intentionally left blank ...
Page 198: ......