Initial Startup
110
Opening the Setup Menu
The following description assumes that the meter is
powered on and the main menu is displayed. All settings
described here are configured via the
Setup Menu
. To
open the
Setup Menu
, proceed as follows:
Main Menu 2
Maintenance
Strip Lots
Profi ciency
Control Lots
Beeper
Linearity
Diagnostics
Linearity Lots
Admin.
12:48 pm
09/18/13
Admin Menu
Date / Time
Language Selection
Setup Menu
12:48 pm
09/18/13
Setup Menu
Date / Time
QC
Test Display
Password
Test Ranges
Reagents
Operator ID
Patient ID
Unlock
Delete Pat.
12:48 pm
09/18/13
1
Touch
in the
Main Menu
to open the
Main
Menu 2
screen.
2
Touch
Admin.
to open the
Admin Menu
.
3
Touch
Setup Menu
to open the
Setup Menu
.
4
Enter the
Setup
password if requested.
Summary of Contents for Inform 2
Page 1: ...ACCU CHEK Inform II BLOOD GLUCOSE MONITORING SYSTEM Operator s Manual ...
Page 3: ......
Page 11: ... 10 This page intentionally left blank ...
Page 65: ...Glucose Control Testing 64 This page intentionally left blank ...
Page 91: ...Linearity Testing 90 This page intentionally left blank ...
Page 99: ...Proficiency Testing 98 This page intentionally left blank ...
Page 149: ...General Product Information 148 This page intentionally left blank ...
Page 167: ...Appendix 166 This page intentionally left blank ...
Page 191: ...Supplement for Observed Test Sequence 190 This page intentionally left blank ...
Page 197: ... 196 This page intentionally left blank ...
Page 198: ......