Chapter 1: Installation overview
24
ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
5
=
!
6
+
4
3
;
0
:
;
0
,
:
-
-
;
,
;
Screen
RS485 line terminations. (Terminate
as shown on the ZP3 panel
Do
terminate on RDU or RCU units.)
^
_
`
a
b
_
^
c
Remote Display Units (RDUs)
Remote Control Units (RCUs)
ZP3AB-SCB-D
Serial Control Bus
Driver Board
SCB
32
2
1
Do
connect screen
to RDU terminal
_
^
c
Do
connect screen
to RDU terminal
_
^
c
Do
connect screen
to RDU terminal
_
^
c
The RDU screen must
D
B
@
d
be connected on the ZP3AB-SCB1 Serial
Control Bus Driver Board in the ZPR Panel. The screen must
B
D
Y
be connected
at the RDU.
RS-485 operates through up to 2,000 metres of screened, twisted-pair cable.
Wiring can be daisy-chained point-to-point, or can be T-tapped or spurred. The
total length of cable in the network should not exceed 2,000 metres. If the
network distances are greater than 2,000 metres, use RS-485 booster units, or
fibre-optic cable. For more information refer to the
P
?
Q
R
S
T
\
e
S
T
f
\
(
*
F
A
@
f
F
'
g
@
A
d
h
B
F
Y
[
B
Y
(
*
C
A
i
(
[
B
'
Y
A
@
@
A
Y
F
D
B
\
]
(
(
Y
(P/N 501-0482ZE-1-01).
The cable is specified in detail inAppendix A “ZP wiring guide” on page 117, but
as a guideline it should be data quality cable with a conductor size of 0.5 mm².
Содержание ZP3
Страница 76: ...Chapter 3 Field wiring 68 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 112: ...Chapter 5 System configuration 104 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 162: ...Appendix B ZP3 system maintenance 154 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 163: ......