Chapter 3: Field wiring
ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
55
n
o
p
q
r
s
u
v
z
|
|
s
r
{
x
x
s
{
|
o
x
1
2
3
4
5
6
7
8
9
10
11
1. Battery connector socket
2. Plug
3. Red
4. Black
5. Grey
6. Grey
7. Battery connector lead
8. Connector
9. Black
10. 230 VAC Types of cables:
(a) spade lugs
(b) screw lugs
11. Red
Refer to Figure 42 above.
• The batteries must be housed in their proper place.
• The batteries must be connected using only the leads provided. These leads
incorporate a temperature-sensing element, used to provide temperature
compensated charging.
• The connector lead connects to the main board with a plug and socket.
Battery positive is RED (item 3), battery negative is BLACK (item 4), and the
control leads are GREY (items 5 and 6).
• Two final connector leads are provided: one for batteries with plug-in type
connectors, the other for batteries with screw connectors. Use the appropriate
lead for your batteries.
• The batteries must be connected in series with a jumper as shown in
Figure 42.
• Take care not to invert the battery connection polarity. If this happens, replace
fuse F1 (6.3 A, slow-blow, 250 V, size 20 mm × 5 mm).
Содержание ZP3
Страница 76: ...Chapter 3 Field wiring 68 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 112: ...Chapter 5 System configuration 104 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 162: ...Appendix B ZP3 system maintenance 154 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 163: ......