Appendix A: ZP wiring guide
126
ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
For MICC cable, earth must be continuous at each connection or junction, in
accordance with BS specification BS 5839 Part 1 (paragraph 24.5), and the
Ì
ó
Ì
Ï
ô
Î
ô
Û
Í
Ú
Ð
Ì
ñ
Ï
Ë
(BS 7671).
ÿ
!
"
1
2
1. Control Unit
2. Isolators
ÿ
#
$
%
1
2
1. ZP Panel
2. Shield connected through
Содержание ZP3
Страница 76: ...Chapter 3 Field wiring 68 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 112: ...Chapter 5 System configuration 104 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 162: ...Appendix B ZP3 system maintenance 154 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 163: ......