Chapter 1: Installation overview
ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
17
program. Configuration programming is normally done on a PC using Planner
(the
?
@
A
B
B
(
*
C
D
*
E
F
B
G
D
H
'
programme) and then loaded into the panel at the site
via a portable PC. This port can also be used to upgrade the ZP3 panel software
to a new version.
The preferred baud rate settings when using Planner to configure a ZP3
panel are shown in Table 5 below.
&
-
!
;
6
+
4
Baud rate
Data bits
Parity
Stop bits
Receive
38400
8
Even
1
Send
9600
8
Even
1
Alternatively you can set Z-Port 1 to ZCP3 to allow control directly from Planner.
The protocol is RS-232, with a three-wire connection as shown in Figure 10. This
port shares internal lines with Z-Port 1a, and consequently the D-plug connection
to the ZP3AB-RS232 board must be physically disconnected before using the
built-in port.
5
#
!
:
0
"
4
"
&
-
0
-
1
14
25
13
1
5
6
9
1
5
6
9
9-pin D
connector
9-pin D
connector
25-pin D
connector
Cable connections
(Ziton RS-232 Type A Cable)
ZP3 Panel
(9-pin)
Computer
(9-pin) (25-pin)
2
3
5
3
2
5
2
3
7
RX
TX
GND
TX
RX
GND
Содержание ZP3
Страница 76: ...Chapter 3 Field wiring 68 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 112: ...Chapter 5 System configuration 104 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 162: ...Appendix B ZP3 system maintenance 154 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 163: ......