Chapter 1: Installation overview
22
ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
panels must have the fail-safe links connected by connecting the jumpers as
shown in Figure 15. All other panels must have their jumpers removed. For long
cable runs wiring should be terminated (using LK10) at each end of the cable
run, in addition to the LK8 and LK9 jumpers. In any case no more than two
terminating links (LK10) must be inserted.
5
!
6
+
4
3
;
0
.
.
8
;
6
0
+
"
Z-Port 2
(+)
(+)
(–)
(–)
(Screen)
(Screen)
Connect to terminals of
the ZP3 AB-NET card
in previous ZP3 panels
Connect to terminals of
the ZP3 AB-NET card in
next ZP3 panels
Channel 2 (unused)
Channel 1
Not used
Do not terminate
Single/dual selector
(Always set as dual. Connect
jumper to left pair of pins.)
RS-485 fail-safe jumpers (LK8 and
LK9) (These jumpers must be
installed on
in a
network. All other panels must have
the jumpers removed.)
I
J
K
L
I
J
M
N
O
J
M
K
ZP3AB-NET1
Network Interface Board
L
K
8
L
K
1
0
L
K
9
RS-485 operates through up to 2,000 metres of screened, twisted-pair cable.
Wiring can be daisy-chained point-to-point, or can be T-tapped or spurred for
short distances i.e. less than 10 m. The total length of cable in the network
should not exceed 2,000 metres. If the network distances are greater than 2,000
metres, use RS-485 booster units, or fibre-optic cable. For more information refer
to the
P
?
Q
R
S
T
U
V
W
X
U
(
Y
H
D
*
Z
S
D
A
*
G
[
B
'
Y
A
@
@
A
Y
F
D
B
\
]
(
(
Y
(P/N 501-0485ZE-1-01).
The cable is specified in detail in Appendix A “ZP wiring guide” on page 117, but
as a guideline it should be data quality cable with a conductor size of 0.5 mm².
To be functional, the optional ZP3AB-NET1 Network Board (Z-Port 2) must be
configured in software. Access the communications parameters menu using the
following menu path:
Setup > System Configuration > Peripheral Comms > Comms Parameters
The following screen is displayed.
Содержание ZP3
Страница 76: ...Chapter 3 Field wiring 68 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 112: ...Chapter 5 System configuration 104 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 162: ...Appendix B ZP3 system maintenance 154 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 163: ......