ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
105
Chapter 6
System commissioning
This chapter provides commissioning instructions for your control panel.
Introduction 106
Verification 106
Verify system design 106
Verify equipment installation 106
Verify wiring 107
Remove the clock battery protective tab 107
Verify system programming 107
System tests 108
Panel check 108
Z-loop wiring check 109
Z-loop wiring parameters 109
Z-loop functional tests 110
Data wiring RS-485 110
Содержание ZP3
Страница 76: ...Chapter 3 Field wiring 68 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 112: ...Chapter 5 System configuration 104 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 162: ...Appendix B ZP3 system maintenance 154 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 163: ......