Chapter 2: Installing the ZP3 fire control panel
ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
37
Refer to Figure 27 below. Once the panel is unpacked, the door and chassis can
be removed as described below.
1. Disconnect the four earth straps attached to the door (item 1).
2. Disconnect the wire and quick release connector (item 2) from the main
board.
3. Cut the cable ties and free the cables.
4. Disconnect the SSB ribbon cable (item 3) from the main board.
5. Remove the two screws (item 4) and remove the door.
6. Disconnect power supply plug (item 5).
7. Remove the four nuts (item 6) and remove the chassis.
5
"
=
!
&
-
1
2
3
4
5
6
1
1. Earth strap
2. Wire * quick release connector
3. SSB ribbon cable
4. Securing screw
5. Power supply plug
6. Securing nut
Содержание ZP3
Страница 76: ...Chapter 3 Field wiring 68 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 112: ...Chapter 5 System configuration 104 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 162: ...Appendix B ZP3 system maintenance 154 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 163: ......