Chapter 2: Installing the ZP3 fire control panel
42
ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
Cable entry and wiring locations for the ZP3 panel are restricted to specific areas
as shown in Figure 31.
5
4
!
&
-
-
1
2
3
4
1. Knockout conduits
2. Mains cable area
3. Low voltage cable area
4. Electronics chassis
It is very important to follow the above rules carefully. This ensures that cables
are properly separated from the electronic circuit boards. It also prevents
physical damage to components and removes noise interference.
Содержание ZP3
Страница 76: ...Chapter 3 Field wiring 68 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 112: ...Chapter 5 System configuration 104 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 162: ...Appendix B ZP3 system maintenance 154 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 163: ......