Chapter 1: Installation overview
16
ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
5
!
&
1
2
3
4
5
6
7
8
9
10
11
12
13
1. Earth straps
2. Chassis earthing nuts
3. Earth connection to detector loop screens
4. Building earth
5. Filter earth
6. Panel enclosure earthing stud
7. Earth path to chassis
8. Earth in cable to PSU
9. Earth path to power supply cover
10. Accessory plate earthing screw to chassis
11. Earth path to accessory plate
12. Contact clips
13. Commissioning board
The built-in RS-232 port is used to connect the ZP3 panel to an external
computer for the purpose of uploading or downloading the panel’s configuration
Содержание ZP3
Страница 76: ...Chapter 3 Field wiring 68 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 112: ...Chapter 5 System configuration 104 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 162: ...Appendix B ZP3 system maintenance 154 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 163: ......