Chapter 5: System configuration
ZP3 Fire Control Panel Installation, Commissioning, and Maintenance Manual
101
×
Ò
¾
·
ß
¥
µ
»
â
Á
§
·
¶
®
¥
°
µ
×
Ò
¾
·
ß
¥
µ
»
â
Á
§
·
¶
®
¥
°
µ
×
Ò
¾
·
ß
¥
µ
»
â
Á
§
·
¶
®
¥
°
µ
×
Ò
¾
·
ß
¥
µ
»
â
Á
§
·
¶
®
¥
°
µ
45
104-111
69
296-303
93
478-495
117
680-687
46
112-119
70
304-311
94
496-503
118
688-695
47
120-127
71
312-319
95
504-511
119
696-703
48
128-135
72
320-327
96
512-519
120
704-711
49
136-143
73
328-335
97
520-527
121
712-719
50
144-151
74
336-343
98
528-535
122
720-727
51
152-159
75
344-351
99
536-543
123
728-735
52
160-167
76
352-359
100
544-551
124
736-743
53
168-175
77
360-367
101
552-559
125
744-751
54
176-183
78
368-375
102
560-567
126
752-759
55
184-191
79
376-383
103
568-575
127
760-767
The setup requirements to conform to EN 54 are provided below. All paragraph
numbers refer to EN 54 part 2 of 1997 unless otherwise specified.
1. Para 7.1.4 and 8.1.3: AVF shall be switched off for all points.
2. Para 7.3.1: Under menu Setup > System Configuration > Zone LED Link,
zone LEDs shall be linked to the appropriate zones.
3. In menu Setup > System Configuration > Control Key Switch Level:
Para 7.4.1: The Accept key shall be set up to level 1 or 2
Para 7.6.1: The Reset key shall be set up to level 2
Para 7.8(a): The Silence Alarms key shall be set up to level 2
Para 7.8(b): The Sound Alarms key shall be set up to access level 2
4. Para 7.8: If accessory board ZP3AB-MA8 outputs are required to serve the
function of “output to fire alarm devices (item C)” then they must be defined
as sounder outputs when mapping. Standard outputs and use of non-
monitored output boards shall not be used to comply with EN 54 item C
requirements.
5. Para 7.10: If accessory board ZP3AB-MA8 outputs are required to serve the
function of “control to fire protection equipment” then they must be defined as
control outputs when mapping. The programming must not include delays to
output when the output is used to serve the function of “control to fire
protection equipment”. Standard outputs and use of non-monitored
Содержание ZP3
Страница 76: ...Chapter 3 Field wiring 68 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 112: ...Chapter 5 System configuration 104 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 162: ...Appendix B ZP3 system maintenance 154 ZP3 Fire Control Panel Installation Commissioning and Maintenance Manual...
Страница 163: ......