5 Operation | 5.1 Prerequisites for Commissioning and Operation
5 Operation
This chapter describes switching on/off the microscope as well as the first operating steps with
the microscope.
Info
For additional information and detailed descriptions, refer to further applicable documents or
ask your ZEISS Sales & Service Partner.
Info
Further information on the software and its operation is available in the software’s online help.
5.1 Prerequisites for Commissioning and Operation
The following basic prerequisites are necessary for commissioning and operation:
§
The Instruction Manual was read prior to commissioning or operation and kept for further
use.
§
The chapter
Safety
was read and understood.
§
The operator is acquainted with the general Windows
®
-based programs.
§
If required: Basic training and safety briefing were successfully completed.
5.2 Switching On the Microscope
Prerequisite
ü
The microscope is connected to the
.
ü
The required light source for transmitted light is
.
ü
The requiredlight source for reflected light is
.
Procedure
1. Switch the microscope on using the
power
switch On/Off
on the left side.
2. If HAL 100 or HBO 100 light sources are used,
switch on the external power supply for the
light source.
3. If used, switch on the HXP 120 V light source. Consult the instruction manual supplied with
the light source.
Instruction Manual ZEISS Axioscope 5, Axioscope 5/7 MAT | en-US | Rev. 13 | 430035-7344-001