120
P9 ASD Installation and Operation Manual
RX2 (AI1) Input Point 2 Rate
Program
Torque
Setpoints
This parameter is used to set the gain and bias of the
RX2
(AI1) input terminal
when the
RX2
(AI1) terminal is used as the control input while operating in the
Torque Control
mode.
Torque Control
is accomplished by establishing an associated
V/f
output
pattern for a given
RX2
(AI1) input level.
This parameter sets
RX2
(AI1)
Input Point 2 Rate
and is the output torque
value that is associated with the setting of
RX2
(AI1)
Input Point 2 Setting
when operating in the
Torque Control
mode.
This value is entered as -250% to +250% of the rated torque.
See
RX2
(AI1)
Input Point 1 Rate
) for additional information on this
parameter.
Direct Access Number — F227
Parameter Type —
Numerical
Factory Default —
100.00
Changeable During Run —
Yes
Minimum — -250.00
Maximum — +250.00
Units — %
Содержание P9
Страница 1: ...TM P9 ASD Install Op Manual TOSHIBA P9 ASD INSTALLATION OPERATION MANUAL DN 64054 004 February 2013 ...
Страница 2: ......
Страница 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Страница 4: ......
Страница 280: ...270 P9 ASD Installation and Operation Manual Figure 38 See Tables 17 and 18 for Actual Dimensions ...
Страница 281: ...P9 ASD Installation and Operation Manual 271 Figure 39 See Tables 17 and 18 for Actual Dimensions ...
Страница 282: ...272 P9 ASD Installation and Operation Manual Figure 40 See Tables 17 and 18 for Actual Dimensions ...
Страница 285: ...P9 ASD Installation and Operation Manual 275 Figure 43 See Table 18 for the associated device Dimensions are in in cm ...
Страница 304: ...294 P9 ASD Installation and Operation Manual W W T3 16 Warranty Card 2 W Phase Over Current 265 ...
Страница 305: ......