P9 ASD Installation and Operation Manual
5
Conductor Routing and Grounding
Precautions
•
Use separate metal conduits for routing the input power, output power, and control circuits.
•
A separate ground cable should be run inside the conduit with the input power, output power, and
control circuits.
•
DO NOT
connect
CC
to earth ground.
•
Use
IICC
terminal as the return for the
V/I
input.
•
Always ground the unit to prevent electrical shock and to help reduce electrical noise.
•
If the ASD is being used in an ungrounded system (floating system) or in an unsymmetrically
grounded system, the EMI filter must be disconnected or removed. The ASD may be damaged if
the EMI filter is used.
•
It is the responsibility of the ASD installer/maintenance personnel to provide proper grounding and
branch circuit protection in accordance with the
NEC
and any applicable local codes.
— T h e M e t a l C o n d u i t I s N o t A n A c c e p t a b l e G r o u n d —
Grounding Capacitor Setting Precaution
If operating using an ungrounded 3-phase power source or within a high-resistance grounding
system, the
Grounding Capacitance
must be set to
Small
or
Out
(typeform-specific) as
shown on
. If set to
High
, a system malfunction, component failure, or fire may result.
Grounding Capacitor Switching
The ASD is equipped with noise reduction capacitors which are used to reduce the EMI leakage via the
3-phase power-input circuit and for compliance with the
Electromagnetic Compatibility Directive
(EMC).
The effective value of the capacitor may be increased, reduced, or removed entirely via the
Selector
Switch
,
Switching Bar
, or the
Switching Screw
— the type used is typeform-specific.
The
Grounding Capacitor Switch
allows the user to quickly change the value of the capacitance of the
3-phase input circuit without the use of tools. The
Switching Bar
and the
Switching Screw
are easily
changed with the use of a wrench or a screw driver, respectively.
See the section titled
.
See figures
,
,
for an electrical depiction of the leakage-reduction functionality of
the
and the methods used to set the capacitance value.
WARNING
WARNING
Содержание P9
Страница 1: ...TM P9 ASD Install Op Manual TOSHIBA P9 ASD INSTALLATION OPERATION MANUAL DN 64054 004 February 2013 ...
Страница 2: ......
Страница 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Страница 4: ......
Страница 280: ...270 P9 ASD Installation and Operation Manual Figure 38 See Tables 17 and 18 for Actual Dimensions ...
Страница 281: ...P9 ASD Installation and Operation Manual 271 Figure 39 See Tables 17 and 18 for Actual Dimensions ...
Страница 282: ...272 P9 ASD Installation and Operation Manual Figure 40 See Tables 17 and 18 for Actual Dimensions ...
Страница 285: ...P9 ASD Installation and Operation Manual 275 Figure 43 See Table 18 for the associated device Dimensions are in in cm ...
Страница 304: ...294 P9 ASD Installation and Operation Manual W W T3 16 Warranty Card 2 W Phase Over Current 265 ...
Страница 305: ......