P9 ASD Installation and Operation Manual
3
Equipment Inspection
•
Upon receipt of the equipment, inspect the packaging and equipment for shipping damage.
•
Carefully unpack the equipment and check for parts that may have been damaged during shipping,
missing parts, or concealed damage. If any discrepancies are discovered, it should be noted with the
carrier prior to accepting the shipment, if possible. File a claim with the carrier if necessary, and
immediately notify the TIC Customer Support Center.
•
DO NOT
install the ASD if it is damaged or if it is missing any component(s).
•
Ensure that the rated capacity and the model number specified on the nameplate conform to the
order specifications.
•
Modification of this equipment is dangerous and is to be performed by factory trained personnel.
When modifications are required, contact the TIC Customer Support Center.
•
Inspections may be required after moving equipment.
•
Contact the TIC Customer Support Center to report discrepancies or for assistance if required.
Handling and Storage
•
Use proper lifting techniques when moving the ASD; including properly sizing up the load, getting
assistance, and using a forklift if required.
•
Store in a well-ventilated location and preferably in the original packaging if the equipment will not
be used upon receipt.
•
Store in a cool, clean, and dry location. Avoid storage locations with extreme temperatures, rapid
temperature changes, high humidity, moisture, dust, corrosive gases, or metal particles.
•
The storage temperature range of the P9 ASD is -13° to 149° F (-25° to 65° C).
•
DO NOT
store the unit in places that are exposed to outside weather conditions (i.e., wind, rain,
snow, etc.).
•
Store in an upright position.
Disposal
Never dispose of electrical components via incineration. Contact your state environmental agency for
details on disposal of electrical components and packaging in your area.
Содержание P9
Страница 1: ...TM P9 ASD Install Op Manual TOSHIBA P9 ASD INSTALLATION OPERATION MANUAL DN 64054 004 February 2013 ...
Страница 2: ......
Страница 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Страница 4: ......
Страница 280: ...270 P9 ASD Installation and Operation Manual Figure 38 See Tables 17 and 18 for Actual Dimensions ...
Страница 281: ...P9 ASD Installation and Operation Manual 271 Figure 39 See Tables 17 and 18 for Actual Dimensions ...
Страница 282: ...272 P9 ASD Installation and Operation Manual Figure 40 See Tables 17 and 18 for Actual Dimensions ...
Страница 285: ...P9 ASD Installation and Operation Manual 275 Figure 43 See Table 18 for the associated device Dimensions are in in cm ...
Страница 304: ...294 P9 ASD Installation and Operation Manual W W T3 16 Warranty Card 2 W Phase Over Current 265 ...
Страница 305: ......